|
1. | project be at the same time under construction in force wall structural construction course in building outside |
| 为了加快施工进度、回投资,在高层框架剪力墙结构施工过程中,让室内、工程同时施工的情况下,需要在建筑物外墙搭设悬挑脚手架。 |
|
|
| |
2. | The banns of their marriage were put up outside the registry office. |
| 他们的婚事在结婚登记处外宣布了。 |
|
|
| |